Commissioning; Filling And Bleeding; Messa In Servizio - salmson SIE Installation Et Mise En Service

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
9

Commissioning

Safety
Preparation
9.1

Filling and bleeding

Fig. 37: Bleed valve
Installation and operating instructions SIE-DIE-PBE
DANGER! Danger of death!
Failure to install safety devices of the electronic module and the
motor can cause electrical shock or contact with rotating parts,
potentially resulting in life-threatening injuries.
• Before commissioning as well as after maintenance work, all safety
devices such as module covers and fan cover that were removed
must be reinstalled.
• Keep a safe distance during commissioning!
Before commissioning, the pump and module must be at ambient
temperature.
• Prime and aerate the system as required.
CAUTION! Damage to the pump!
Dry running will destroy the mechanical seal.
• Make sure that the pump does not run dry.
• To avoid cavitation noise and damage, a minimum intake pressure
must be guaranteed at the suction port of the pump. This minimum
intake pressure depends on the operating situation and the duty point
of the pump, and must be defined accordingly.
• The main parameters for defining the minimum intake pressure are
the NPSH of the pump at its duty point and the vapour pressure of the
fluid.
1
• Bleed the pumps by releasing the bleed valves (Fig. 37, Item 1). Dry
running destroys the mechanical seal of the pump. The differential
pressure sensor must not be bled (risk of destruction).
WARNING! Danger due to extremely hot or extremely cold pressu-
rised fluid!
Depending on the temperature of the fluid and the system pres-
sure, when the vent screw is opened completely, extremely hot or
extremely cold fluid in liquid or vapour form may escape or shoot
out at high pressure.
• Always exercise caution when opening the vent screw.
• Protect the module box from any water escaping when bleeding.
WARNING! Risk of burns or freezing to the pump when body parts
come into contact with the pump!
Depending on the pump or system operating conditions (fluid tem-
perature), the entire pump can become very hot or very cold.
• Keep a safe distance during operation!
• Allow the pump/system to cool off/warm up before performing any
work.
• Always wear protective clothing, protective gloves and protective
goggles when working.
WARNING! Risk of injury!
If the pump/system is installed improperly, liquid may be ejected
during commissioning. Individual components may also become
loose.
• Keep a safe distance from the pump during commissioning.
• Wear protective clothing, protective gloves and protective gog-
gles.
DANGER! Danger of death!
Falling pumps or pump parts may result in life-threatening injuries.
• When performing installation work, protect the pump components
against falling.
English
89

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

DiePbeSie serieDie serieSie 2 04-17/5,5Die 2 04-17/5,5

Table des Matières