Fe Connection - Aventics PROFIBUS DP Mode D'emploi

Masquer les pouces Voir aussi pour PROFIBUS DP:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 141
100
AVENTICS | PROFIBUS DP | R499050016–BDL–001–AE
Assembly
PO WE R
X10
2
3
VS HF04
grounding
VS HF03 LG
grounding
Tab. 11:
Pin
1
2
1
3
4
4

6.3.7 FE connection

O
To discharge EMC interferences, connect the FE connection
(1) on the EP end plate of the VS via a low-impedance line
with a functional grounding.
Recommended cable cross-section: 10 mm
When delivered, the screw for the FE connection is assembled on
the EP end plate of the VS. As an alternative, the FE connection
can be made on the E end plate (2) (see also Fig. 1 on page 84).
O
To do this, unscrew the screw for the FE connection from the
EP end plate of the VS (1) and screw it into the E end
plate (2). Then establish the connection with functional
grounding there.
Fig. 7:
O
Affix the grounding on the FE connection of the
E end plate (2).
Load supply assignment for 8x output module, DO8,
M12x1, A-coded
X10
Assignment
0V_U
GND reference for power supply 2
Q2
24V_U
24 V supply voltage 1 for outputs O0 to O3
Q1
0V_U
GND reference for power supply 1
Q1
24V_U
24 V supply voltage 2 for outputs O4 to O7
Q2
2
FE connection on the VS HF04 with PROFIBUS DP
on the EP end plate (1) or an E end plate (2)
2
1

Publicité

Table des Matières
loading

Table des Matières