GYS ENERGY STATION Notice Originale page 13

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 1
Translation of the original instructions
24V Mode
• Unplug the power supply cable or place the charging switch on « 0 ».
ou
• Connect the cables to the 24V output.
• Connect the clamps on the vehicle battery to start respecting the polarities.
• Go to the driver's seat and turn the ignition key. If your engine does not start, wait 3 mi-
nutes until next attempt. ( 6 sec max)
- If the cooling period between each attempt (3 minutes) is not observed or if the duration of
the attempt is too long (> 6 seconds), the chances of a successful jumpstart are significantly
reduced (risk of power loss).
- Risk of battery acid leaks or damage if the recommended periods are not observed.
- If the vehicle does not start, it may be a problem other than a faulty battery: alternator,
glowplug...
• Charge the batteries after using. (see charger mode)
INTERNAL BATTERIES TESTER MODE
To test the Energy Station batteries:
• Unplug the power supply cable or place the charging switch on « 0 ».
ou
• Press the key of the battery to test and the result displays:
Green light : battery charged (voltage above 12.8V).
=> starting possible.
Orange light : battery partially charged (voltage in between 12.8V and 12.4V),
=> it is highly advised to charge before using.
Red light: battery discharged (voltage below 12.4V)
=> starting impossible
No light: no battery detected or battery highly discharged (<6V)
=> starting impossible
Nb : The test is only relevant if the battery rested for at least 15 minutes.
CHARGER MODE
Charging of the Energy station internal batteries
In order for the Energy station to be always operational, and to deliver the maximum starting power, it is recom-
mended to charge the batteries after each use and to keep them on charge until the next use.
The Energy Station integrates 2 automatic chargers which charge and keep fully charge without watch the 2 internal
batteries (Floating System).
To charge the internal batteries:
• Plug the charger to the mains 230V 50/60Hz.
• Switch on « I ».
• Before starting the charge, the machine indicates the battery condition for 2 sec. :
- Red light: Battery highly discharged.
- Orange light: battery discharged but a starting is possible.
- Green light: battery is charged.
ENERGY STATION
EN
13

Publicité

Table des Matières
loading

Table des Matières