Electrical Connections And Schematics; Blower Box Wiring Connections - Napoleon HYBRID 150 Instructions D'installation Et D'opération

Masquer les pouces Voir aussi pour HYBRID 150:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

44
EMBER STOP: SIDE DIMENSIONS
3"

7.0 ELECTRICAL CONNECTIONS AND SCHEMATICS

ALL ELECTRICAL WIRING AND CONNECTIONS MUST BE DONE BY A QUALIFIED ELECTRICIAN.
THE ELECTRICAL INSTALLATION MUST SATISFY ALL RELEVANT ASPECTS OF CSA 22.1 AND IN
ALL WIRING BRINGING 120V OR GREATER TO THE HMF150 AND ITS MODULES, SHALL BE AS
SPECIFIED IN ELECTRICAL CODE BUT MUST HAVE WIRE INSULATION VALUE OF NO LESS THAN 90°C.
MUST MAINTAIN A MINIMUM CLEARANCE OF 12" BETWEEN ELECTRIC WIRING CARRYING 120V OR
GREATER AND ALL SURFACES OF THE SUPPLY PLENUM AND DUCT WORK.
MAINTAIN MINIMUM 18" CLEARANCE BETWEEN ALL FURNACE EXHAUST COMPONENTS AND
7.1

BLOWER BOX WIRING CONNECTIONS

STEP #1
Pass wiring through the liquid tight connector on the side of the
electrical box, and connect the wire ends as per the following
wiring schematic.
BLOWER BOX WIRING CONNECTIONS:
"NO ELECTRIC FURNACE IN INSTALLATION"
A B
E
F
W415-0910 / A / 09.16.10
3"
EMBER STOP
PARTICULAR CAN/CSA-222.2 NO.0-M91, NO.3-M1988, NO. 23.1-M1986.
ELECTRICAL WIRING CARRYING 120V OR GREATER.
LEGEND
Conduit from motor:
A - Red
B - Blue
C D
C - Black
D - White
I - Green ╧
J - Ground screw in electric box
Wiring connections to fan control in electric
furnace module:
J
G
H
K - Red
I
L - Red
EMBER STOP: FRONT AND REAR DIMENSIONS
18"
EMBER STOP
STEP #2
Fasten cover to the electrical
box.
Tighten liquid tight connector.
BLOWER BOX WIRING CONNECTIONS:
"WITH ELECTRIC FURNACE IN INSTALLATION"
"B" Harness wires:
E - Black (3)
F - Black (12)
G - White (N)
H - Red (2)
2"
L
A B
C D
J
G
H
F
K
E
I

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Hmf150

Table des Matières