EdilKamin QUEBEC Installation, Usage Et Maintenance page 40

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 54
MOUNTING THE COVERING
MONTREAL - MIAMI
Photo 1: Representation of the stove after unpacking
N.B.: the Thermo-stoves come furnished with the ceramics packed in separate boxes in order to avoid damage during transport as
well as to lighten and facilitate the manual handling of the product.
Installing ceramic tops
Remove the 4 pins (A) from the plating top and move the 2 aluminium sides (B) slightly forward.
Put in the ceramic sides (C) in from the top downwards. On the inside of the ceramic sides there is an arrow (D) that indicates the
side of the tile that must be towards the front of the stove (follow the views of the sides E and F).
Put the 2 aluminium sides back in position, fix the 4 pins removed before, and position the ceramic top (G).
Installing ceramic tops
Photo 1
A
A
C
C
B
B
Left side view E
Right side view F
D
C
G
40

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

TorontoMontrealOttawaDetroitBostonMiami ... Afficher tout

Table des Matières