EdilKamin QUEBEC Installation, Usage Et Maintenance page 38

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 54
MOUNTING THE COVERING
QUEBEC - TORONTO - DETROIT - BOSTON
Phase 1: Representation of the stove after unpacking
N.B.: the Thermo-stoves come furnished with the ceramics packed in separate boxes in order to avoid damage during transport as
well as to lighten and facilitate the manual handling of the product. The Ottawa/Atlanta Boiler has its steel front sides preassembled
at the factory.
Phase 2: Mounting the ceramic lower front panel
Position the front panel on the lower portion of the door so that the to protruding portions on the back fit into the holes (A).
Attach the front panel using the brackets (B) and screws supplied for this purpose, working from the back face of the small door
(N.B.: the plates can be found in a small bag inside the hearth of the thermo-stove).
When opening the door, check whether it rubs against the ceramic sides of the covering.
(N.B.: if necessary, use the supplied trim between the ceramic front panel and the cast iron front panel in order to compensate for
any in accuracies, which are typical of ceramics).
Phase 3: Mounting the ceramic upper front panel
Remove the cast iron upper front panel (C) by pulling it forward to disengage it from the springs that hold it in place (hold the door
open to facilitate the operation).
Apply the plates (E) to the rear of the upper front panel in ceramic and fastening them within the appropriate holes using the sup-
plied self-threading screws. (N.B.: the plates can be found in a small bag inside the hearth of the thermo-stove).
Place the ceramic front panel in place so that the two protuberances at the back fit into the holes (D) on the cast iron front panel (C).
Attach the ceramic front panel using the brackets (E) and supplied hexagon-head screws, working from the back face of the cast
iron front panel. (N.B.: if necessary, use the supplied trim between the ceramic front panel and the cast iron front panel in order to
compensate for any in accuracies, which are typical of ceramics).
Replace by fitting into the appropriate fastening clips.
Phase 4: Installation of ceramic side panels
4/2. Apply the plates (I) to the rear of the ceramic side panels (large G and small H) and fastening them within the appropriate holes
using the supplied screws (N.B.: the plates can be found in a small bag inside the hearth of the thermo-stove).
Disassemble the sheet metal half panels at the rear by removing their fastening screws (Refer to the letter P in the diagram shown
below).
4/1. Mount the ceramic side panels (G and H) in the correct sequence small/large following these steps:
- Each element should be approached from the side and fitted into the slot (M - present along the front edge of the element itself) on
the vertical toothed sheet metal profile of the structure.
4/1. Fasten the plates (I) applied, to the structure of the stove using the screws supplied in the appropriate holes (N).
4/2. Adjust the couplings and the alignments using the appropriate adjustment screws (O); the adjustment screw is located below
each ceramic element so it is therefore necessary to remove the elements in question one at a time in order to work on them.
-Replace the rear cast iron semi-side panels (Refer to the letter P in the diagram shown below)..
Phase 5: Mounting the ceramic top
Place the ceramic top in its housing so that the protuberance at the back fits into the hole (P) in the cast iron top.
Phase1
Phase 2 Mounting the lower front panel
A
A
rear view of small door
P
B
B
rear view of small door
A
A
finished view
38

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

TorontoMontrealOttawaDetroitBostonMiami ... Afficher tout

Table des Matières