Installation Instructions; Installation-Vented To The Outside; Ductwork, Wiring Locations; Step 1, Install Framing For Hood Support - Monogram ZV830 Mode D'emploi

Masquer les pouces Voir aussi pour ZV830:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION—VENTED TO THE OUTSIDE

DUCTWORK, WIRING LOCATIONS

Determine the exact location of the vent hood.
• Locate the template packed with the literature.
– Measure 36" from the floor to the top of the cooking
surface. Add hood installation height determined on
page 7. Mark that location.
– Use a level to draw a straight pencil line on the wall.
5-1/2" centerline to wall
5-1/2"
House Wiring
Location
1-1/4"
10-1/16"
TOP
MOUNTING
NOTE: Top
HOLE
mounting
screws MUST
DRILL 1/8"
engage wood
PILOT HOLE
support.
18"
9-7/16"
15-7/16"
Min.
BOTTOM
MOUNTING
HOLE
Installation Height
Align Bottom Edge With
Pencil Line Indicating
Bottom of Hood
– Tape the template in position along the penciled
line. CHECK TO BE SURE THE TEMPLATE IS LEVEL.
Ceiling ducting:
If ductwork will vent straight up to the ceiling:
• Use a level to draw a line straight up, from
the centerline on the template to the ceiling.
"
• Measure 5-1/2
from the back wall to the centerline
"
of an 8-1/2
hole on the ceiling.
NOTE: If drywall is not present, add drywall thickness
"
to the 5-1/2
dimension.
Wall Ducting:
If ductwork will vent to the rear:
• Use a level to draw a line straight up from
the centerline on the template.
• Measure at least 27-3/4
that indicates the bottom installation height, to the
"
centerline of an 8-1/2
be elongated for duct elbow.)
HOUSE WIRING LOCATION:
• The junction box is located on the top left side
of the hood.
• Wiring should enter the back wall at least 18
the bottom of the hood, and within 5-1/2
side of the centerline.

Installation Instructions

FOR CEILING VENT DUCTING
Wall vent
Ceiling
27-3/4" min.
8-1/2" dia. hole
C
L
installation
1-1/4"
TOP
MOUNTING
NOTE: Top
HOLE
mounting
screws MUST
DRILL 1/8"
engage wood
PILOT HOLE
support.
REAR WALL
MOUNTING TEMPLATE
15-7/16"
9-7/16"
C L
BOTTOM
MOUNTING
HOLE
Installation Height
Align Bottom Edge With
Pencil Line Indicating
Bottom of Hood
"
above the pencil line
dia. duct hole. (Hole may
"
above
"
of the left
1
INSTALL FRAMING
FOR HOOD SUPPORT
IMPORTANT
of supporting 100 lbs.
above
height
If drywall is present, mark the screw hole locations for
the top mounting brackets. Remove the template.
• Cut away enough drywall to expose 2 vertical studs
at the bracket location indicated on the template.
• Install a horizontal support at least 1
between two wall studs at the mounting screw
location. The horizontal support must be flush with
the room side of the studs. Use cleats behind both
sides of the support to secure to wall studs.
IMPORTANT: Reinstall drywall for an even mounting
surface.
9
Framing must be capable
8" Min. Opening for Ductwork
8-1/2" min. opening for ductwork
View From Rear
View from rear
Centerline of
Centerline of
installation
Installation
space
Space
cleats
Cleats
1" x 6" min.
1" x 6" Min.
mounting
Mounting
support
Support
"
"
x 6

Publicité

Table des Matières
loading

Table des Matières