Mettler Toledo IND780 Guide D'installation page 60

Masquer les pouces Voir aussi pour IND780:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 295
2. Check to ensure that sufficient length of cable will remain inside the terminal to make
3. Use a razor knife to cut around the circumference of the insulation about 0.5" away from the
4. Use metal shears to cut back the inner sheath, leaving about 3" or 4" inside the body of the
5. Slide the ferrule over the end of the cable and into the body of the gland. The metal part of the
2-36
METTLER TOLEDO IND780 Installation Guide
connections, then tighten the clamp in position.
body of the gland. Slit the insulation along its length, taking care not to cut into the cable
inside. Remove the insulation.
gland.
Figure 2-56: Inner Sheath Trimmed Back
ferrule will protrude from the body of the gland.
Figure 2-54: Clamp in Position
Ferrule
Figure 2-55: Insulation Trimmed Back
64057253
|
14
|
08/2014

Publicité

Table des Matières
loading

Table des Matières