Mettler Toledo IND780 Guide D'installation page 39

Masquer les pouces Voir aussi pour IND780:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 295
2. Before connecting the wires, pass the cable through an appropriately sized cable grip and into
3. A metal cable gland is provided with the Analog Load Cell and POWERCELL MTX and PDX
4. Press the grommet into the body of the cable grip, as shown in Figure 2-25.
64057253
|
14
|
08/2014
the enclosure. Then, if required, place a grommet around the cable as shown in Figure 2-23.
Figure 2-23: Cable Inserted Through Grommet, Nut, and Cable Grip
options. To further protect the IND780 from external influences, the cable's shield wire can be
spread out and pressed into cable gland by the grommet, as shown in Figure 2-24.
Figure 2-24: Installing Metal Cable Gland with Shield Wire
Grommet in
Cable Grip
Figure 2-25: Grommet in Body of Cable Grip
METTLER TOLEDO IND780 Installation Guide
2-15

Publicité

Table des Matières
loading

Table des Matières