4.5. Voltage sensing and power supply kit (cont.)
4.5.4. Other configurations
The kit can be adapted to other configurations but requires connections or programming modification.
Voltage sensing and power supply kit mounting procedure
STEP 1
Network
STEP 2
Sources (cables) entry
STEP 3
Sources / Switches cabling and
connectors plugging
Refer to following paragraphs for steps description
(1) Not required in case of pre-set neutral on the left kit from factory.
96
ATyS 3e, 6e, 6s - Ref.: 531 848 G GB
Network 230 / 400 Vac
Network 127 / 230 Vac
Bottom entry
Top entry
Priority network connected to switch I
Priority network connected to switch II
4. CoNNECtIoNS
No action
A & B wires position modification
Kit to mount downstream
Kit to mount upstream
Connectors to plug in (on control module)
according to sources entry
Connectors to plug in (on control module)
according to sources entry