INSTALLATION
Commissioning
f Connect the programming unit connecting cable plug to the
f
PCB.
f Hook the appliance cover at the top rear into the back panel.
f
Pivot the appliance cover downwards. Check that the appli-
ance cover is securely seated at both top and bottom.
f Tick the selected connected load and rated voltage on the ap-
f
pliance cover type plate (on both sides). Use a ballpoint pen
to do this.
f Secure the appliance cover with the screw.
f
f Fit the fascia to the appliance cover.
f
90
|DHE Connect | DHE Touch
f Switch the power supply ON.
f
Note
The display activates after approximately 1 minute.
f Check the function of the appliance and the mini wireless
f
remote control.
f Carry out quick commissioning for the most important set-
f
tings. You can also adjust the settings to your needs later via
the "Settings / Standard settings" menu.
12.1.1 Changing the connected load: DHE Connect 18/21/24 and
DHE Touch 18/21/24
If you select a connected load other than the 21 kW factory setting
for appliances with selectable connected load, take the following
steps.
The appliance must be connected to the power supply to make
the change. Proceed as described in chapter "Commissioning",
but switch ON the power supply immediately after activating the
safety switch.
www.stiebel-eltron.com