• Date of manufacture with month and year
• Manufacturer's mark
• Traceability code
• CE marking
• Applicable standard
• Part number
7. Initial commissioning
Before using the round sling for the
first time, it must be ensured that
a) it is exactly the round sling you ordered:
b) the manufacturer's test certificate is present;
c) the marking and working load limit (WLL) attached
to the round sling correspond to the data on the test
certificate.
d) the CE declaration of conformity is present;
e) the rigger possesses or has been taught the necessary
qualification or expertise;
f) the operating manual has been understood and is
present and always accessible.
7.1 Examinations before
initial commissioning
Before initial commissioning, the condition must be
checked by an expert to ensure it is as new.
It should also be checked that the instructions for use
and the identification label or tag are available and that
their marking is legible.
7.2 Marking before initial
commissioning
The initial commissioning is to be documented by
an expert using suitable software or with the help of
an appropriate archiving system. The date of the next
regular inspection must also be marked by an
authorised person at the time of initial commissioning.
The marking can be done either on the test tag, directly
on the label (textile) or by a separate test sticker.
The date of the next test is to be marked (see Fig. 7).
It is only through the marking that the user knows
whether and for how long the product may still be used.
Polytex
round slings 12/2021 / subject to change!
8
®
Gehen Sie kein Risiko ein!
Pfeifer Mobile Services prüft Ihre Anschlag- und Lastaufnahmemittel
Verpassen Sie nicht den nächsten Termin zur gesetzlich vorgeschriebenen Arbeitsmittelprüfung!
Erstinbetriebnahme durch befähigte Person gem. BetrSichV durchführen, Plakette abziehen,
Zeitpunkt der nächsten Prüfung gem. BetrSichV kennzeichnen und auf Neuprodukt anbringen!
Erstinbetriebnahme durch
Erstinbetriebnahme durch
befähigte Person gem.
befähigte Person gem.
BetrSichV
BetrSichV
Nächste Prüfung
Nächste Prüfung
gem. BetrSichV
gem. BetrSichV
nächste Prüfung durch
nächste Prüfung durch
Mobile Services
Mobile Services
Tel. +49 800 723 72 44
Tel. +49 800 723 72 44
Pfeifer PUSH
Ihre umfassende Service-Hilfe: Das Produktverwaltungssystem
Sichern Sie sich einen Zugang zur webbasierten Pfeifer Prüfdatenbank und behalten
Sie immer den Überblick, wann die nächsten gesetz lichen Prüfungen notwendig sind!
05.20.XX LA/WA 440934
Fig. 7
8. Assembly and installation
instructions
Loads can only be attached correctly and
accidents avoided if the round slings are
assembled correctly.
8.1 Basics
• The prerequisite for proper assembly and installation
is the correct application as described in the Descrip-
tion/Technical Data.
• Carefully plan the procedure to attach, lift and set the
load down before starting the lifting process.
• The weight, type of rigging, geometry, surface
properties and special structural features of the load
must be considered.
• The weight of the load must be known or is to be
determined by weighing or calculation.
• The position of the centre of gravity must be known
or determined.
• The crane hook must be positioned vertically above
the centre of gravity of the load.
• In the case of multi-leg attachment devices, the
larger angle of inclination ß (Fig. 8) determines the
mode factor.
Angles of inclination
Neigungswinkel > 60°
sind unzulässig!
> 60° are imper-
missible
Fig. 8
Erstinbetriebnahme durch
Erstinbetriebnahme durch
Erstinbetriebnahme durch
befähigte Person gem.
befähigte Person gem.
befähigte Person gem.
BetrSichV
BetrSichV
BetrSichV
Nächste Prüfung
Nächste Prüfung
Nächste Prüfung
gem. BetrSichV
gem. BetrSichV
gem. BetrSichV
nächste Prüfung durch
nächste Prüfung durch
nächste Prüfung durch
Mobile Services
Mobile Services
Mobile Services
Tel. +49 800 723 72 44
Tel. +49 800 723 72 44
Tel. +49 800 723 72 44
Termin für die nächste Prüfung vereinbaren!
Mobile Services
Tel.: +49 (0) 800-723-72-44
E-Mail: pruefservice-azs@pfeifer.de
Last
Load