PROCEDURES FOR UNLOADING THE MACHINE USING A CRANE OR HOIST
Unloading personnel must be equipped with chains or ropes compatible with the weight and di-
mensions of the machine to be moved and in compliance with current safety regulations.
IMPORTANT WARNINGS !
-
The slings must comply with ISO 4878 - ISO 9351 standards.
-
Use the sling only if the label containing all the manufacturer information is affixed to it and
the capacity is clearly visible.
-
Inspect the slings before all lifting operations. Do not use them if they are damaged, cut or
worn.
-
Follow the load factors indicated for the various standardised configurations.
-
Use adequate protection for lifting loads with sharp edges.
-
Do not twist or knot the sling.
-
Insert the other ends of the slings in the lifting equipment hook.
-
Before moving the machine, ensure that there are no persons nearby.
-
Carefully follow the unloading procedures described below.
1.
remove the cover screws as per figure n°10
2.
lift the rear cover
3.
lean with care the cover
4.
lift the machine:
- machine with jointed trolley : pass the belt in the front part of the central tube (Figure n°
11).
- pass the belts in the two eyebolts on the side of the head attached to the top of the col-
umn (Figures n ° 12 - 13).
Figure n° 11
Figure n° 12
English
Figure n° 10
Figure n° 13
21