Repair
7.
If you have led the rope out through the pulley cross, then install the cable clamp according to this procedure: Installing the
cable clamp (Page 86)
①
Absorber sphere
②
Rope
③
Meander element
④
Cable clamp
Figure 28
Overview of rope clamp
8.
Place the cover plate on the jib. Screw the cover plate to the jib with four M6x16 half-round head screws. The tightening torque
is 6 Nm.
Figure 29
Installing the cover plate
9.
Pull the cable at the cable clamp only until the rope clamp is relieved and free. If you pull too far, the rope clamp may damage
the pulleys in the pulley cross. Remove the rope stopping mechanism with an 8 mm socket. Remove the pulley.
96
⑤
M4x14 hexagon socket-head screw
⑥
M4 hexagon nut
⑦
Rubber adhesive tape, self-adhesive on one side
⑧
Charging cable
Installation of the cable management system V1.6
A5E53160522-AC, 05/2024