4.
Remove the four M6x12 cylinder head screw and pull the rope out of the pulley cross.
5.
Place the pulley cross on the jib and screw the pulley cross to the jib.
Tighten the screws to 5 Nm.
Figure 26
Assembly and disassembly of the pulley crosses
①
6.
Pull the rope
out over the horizontal guide
Figure 27
Laying the rope
Installation of the cable management system V1.6
A5E53160522-AC, 05/2024
②
and between the two vertical guides
Repair
③
of the pulley cross.
95