Installing the cable management
5.
Place the bridge between the left and right mounting plates. The four threaded bolts must pass completely through the holes of
the bridge. Screw in the bridge with four M6 hex nuts. Do not tighten the nuts yet.
Figure 6
Screwing the bridge into place
6.
Position the cover plate so that the four threaded bolts pass completely through the holes of the fan cover plate.
Install the grounding cables on both pedestals. Screw the cover plate to the grounding cables using four M8 hexagon nuts and
lock washers.
Screw the other ends of the grounding cables to the charging station using an M6 hexagon nut + lock washer each.
Figure 7
Screw down the fan and ground cable cover plate
84
Installation of the cable management system V1.6
A5E53160522-AC, 05/2024