Télécharger Imprimer la page

Siemens SICHARGE D 8EM5907-0AA01-1AA4 Information Du Produit page 90

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 9
Installing the cable management
Note
Store aside rope clamp and pulley
If a repair is required – on the cable clamp or the charging cable for example – then you must secure the rope on the rope box.
Therefore, keep the rope clamp and pulley in a DIN A4 envelope in the document pocket of the charging station.
Installing the cover
The following operating instruction shows how to install the cover of the charging station.
1.
Place the cover on the charging station.
Figure 17
Placing the cover
2.
Screw in the cover with the ten M6x16 hexagon socket-head screws.
Allen size is 4 mm
The tightening torque is 3 Nm
Figure 18
Screwing down the cover
3.
Click the filter cover first upwards and then downwards in the cabinet. Lock the quick fasteners and install the rear device door
again. Follow the same instructions as in figure 7 of the section Installing the roof and filter cover.
See also
Removing the roof (Page 81)
90
Installation of the cable management system V1.6
A5E53160522-AC, 05/2024

Publicité

loading