Télécharger Imprimer la page

Arneg Perth 6P Manuel D'installation Et De Service page 66

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 104
Perth 6P - Pelican 6P
English
Perth5
English
3
(referred to the central
riser)
A) Remove the screws
that fix the wiring
protection
plate in
place;
B) Pull out the cable;
C) Pull out the
connector;
D) Open the connector.
4
((referred to the right and left-hand risers)
This phase applies both for dismantling the right-hand
door and for preparing the left-hand riser.
A) Remove the side buffer profile using a spatula
B) Pull out the cable and open the connector..
5
Loosen the screws that fix the anti-fraying fork on the
upper part of the door. Let the fork slide and rotate it as
indicated in figure A..
6
In order to remove the door, it must be lifted
and simultaneously rotated as indicated in the
drawing so that it is first released from its
housing on the bottom part.
Given the weight of the door, the
collaboration of two workers is recommended.
Do not exert unneccessary force
62
32
B
A
A
D
C
B
05060216 00 06-2022
05060095 00 30/01/2009

Publicité

loading

Ce manuel est également adapté pour:

Perth 6p 1ePelican 6pPelican 6p 1e