Lay out and fixing of heating cable
Notes:
EN
•
maintain the design spacing to within ± 1 cm
DE
•
keep heating cable 5 cm from edges and obstructions
•
do not cross expansion joints
FR
•
avoid sites of future ground work (kerbs, drains, etc.)
PL
1
Set the heating cable spool on a reel roller.
CZ
RU
NL
SV
NO
FI
Position the heating cable (with cold lead
2
connection installed) out to the point of the
power connection.
WARNING: Do not cross over or shorten the
heating cable
|
16
nVent.com/RAYCHEM
Working from the cold lead connection, fix the
3
heating cable to the reinforcing mesh at
100 mm intervals using cable ties (KBL-09).
At the end of a straight run, turn the cable 180
4
degrees and run the cable in the opposite at the
desired spacing.
Continue to fix the heating cable to the
reinforcing mesh at 100 mm intervals, until the
cable is completely attached and the desired
surface is appropriately covered.
WARNING: Do not cross or shorten the heating cable