7
START UP
Once the water and electrical connections have been
made, proceed to start up the machine.
Open the mains water supply tap (A).
Close the protection switch (D).
Position the machine power button (13) to position
"1".
The machine switches on and the display shows the
software version.
Then the display shows the screen indicated in the
image.
The auto-levelling device comes into operation so that
the water reaches a normal level in the boiler.
Wait until the machine reaches the set point
temperature set on the display.
Check the pump pressure on the gauge (5) by starting
up a group with the filter holder inserted and filled
with regularly grinded, dosed and pressed coffee, in
order to get the real brewing pressure (8-9 bar for
espresso).
The machine is now ready for use.
Brew
groups
completes in about half an
hour after the set point
temperature
reached.
7.1
Depending on the quantity of ground coffee, the
appropriate filter must be as shown below to avoid
that, once the coffee has dripped out, the coffee
grounds tablet remains attached to the brew unit.
1 Cup
warming
has
been
2 Cups
Do not press the hot water
outlet button before the
set point temperature set
on the display is reached.
For technical adjustments
refer
to
the
manual.
Coffee filters supplied
English
technical
23