English
Before proceeding with installation check that:
• there are no bumps, signs of knocks or deformities
• there are no damp patches or marks which could
lead one to assume that the packaging has been
exposed to the elements
• there are no signs of tampering
Once one is satisfied that transportation has been
correctly effected, proceed with installation.
Make sure the appliance is
installed on a flat surface
capable
of
weight
(see
specifications"
and take care of leaving a
clear area of at least 30
cm around the machine.
The least height of the
support's top must be 110
cm (the highest surface of
the
appliance
however be at least 1.5 m
from the ground level).
the
gradient
supporting surface should
NOT exceed 2°;
Proceed with installation following the instructions
according to the sequence as described below.
18
5.1
bearing
its
"Technical
chapter)
shall
of
the
Connect purifier (C) to the water mains (A).
Water connection
Before
connecting
appliance to the water
network, please read and
follow
the
regulations in force in your
country.
Water hardness should not
be lower than 8°F.
The machine should be
supplied
with
treated with a descaling
device, particularly in case
of water with high content
of calcium and magnesium
salts (hard water).
Make
sure
network provides drinking
water,
with
ranging
between
MPA and 0.8 MPA (1.5
and 8 bars).
the
applicable
water
the
water
pressure
0.15