5.1. Connection to 16A or 32A single phase network
In the case of a 16A or 32A single-phase connection, the PH+N connection on the
control unit board of the spa must comply with the diagram below. Ensure that the
j32/j26 jumper is connected on the board.
ORCHIDEE RANGE, 16A
TERMINAL
The Orchidée spa can operate on 230V-16A (ac). Installation is therefore simple, as it
does not require any modification to your electrical installation. Operation on 16A is
configured as the default operating option (factory configuration).
In 16A configuration, the spa is fitted with a shedding system: when the massage pump is
switched on (without pump filtration speed 1), the heater is cut off.
To make the connection, follow the steps below:
Remove the access panel on the digital control side, which opens the spa
•
control.
Ensure that switch 10 of the Switchbank connector in the electrical unit is in
•
the ON position. (up)
The other DIP switches must not be changed, risking irrevocable damage to the
5.1.1. Installation with shedding limited to 16A (factory
electronic unit board.
32A SINGLE PHASE 230V AC POWER SUPPLY
OR
configuration)
8
J32
J26