Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 28
7

Maintenance

7.1
Interval for general inspection
A general inspection (including leak test) must be carried out on this system every 5 years in accordance with DIN EN
1825.
7.2
Maintenance interval and tasks
The system must be serviced annually by a competent expert / inspector.
The following tasks are to be carried out during maintenance:
Carry out disposal.
Check the inside of the tank.
Cleaning of the inside of the tank (particularly the inlet and outlet spots) using a high-pressure cleaning device.
Pump out the tank again.
Use a gripper and scraper to remove objects and deposits.
Check the tightness of the pipe connections.
If necessary, clean the outside of the system.
Record the maintenance in the log book.
Error
Odour pollution
016-185_01
Cause
Wastewater pipes leaking
No ventilation pipe, cross-section too small
System parts are leaking
Closed room with no air exchange.
Remedial measures
Check firm fit and seals, repair if necessary.
Retrofit on-site.
Eliminate leak.
Create ventilation options, forced ventila-
tion.
25 / 82

Publicité

Table des Matières
loading

Table des Matières