Operational Control - Biral AX RED Serie Instructions D'installation Et D'entretien

Pompe di circolazione biral
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

6. Start-up
6.1 General
Before start-up, it is vital that the unit is filled with the delivery medium and ventilated.
Close to the inlet nozzles of the pump, it should also be the required minimum intake pressure.
The system can be ventilated via the pump. The pump itself is self-ventilating.

6.2 Operational control

After switching on the power supply the pump must start up independently:
the Biral impeller turns and flashes green.
Watt display
[W]
Status
Pump running
english
99
|

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ax blue serie

Table des Matières