100
english
|
5.5 Connection drawing Clamp description
6. Start-up
6.1 General
Before start-up, it is vital that the unit is filled with the delivery medium and ventilated.
Close to the inlet nozzles of the pump, it should also be the required minimum intake pressure.
The system can be ventilated via the pump. The pump itself is self-ventilating.
Änd.Index
Datum
6.2 Operational control
PrimAX 32-x 180
After switching on the power supply the pump must start up independently:
Biral Connector montieren
the Biral impeller turns and flashes green.
für BA
Watt display
LED 4
[W]
Visum
Ersetzt durch:
Status display
Status
Biral AG
LED 3
CH-3110 Münsingen
961935_00
OFF
Pump running
L N
AC in
~1x230V
10%
±
50/60 Hz
PP1
LED 1
LED 2
Ersatz für:
Massstab
gezeichnet 13.05.2015
1:2.6
geprüft
LED 3
Freigabe
LED 4
PDM_Nr
Zeichnungsnummer
961934
Mains connection:
1x230V +/- 10%, 50/60Hz
Terminals:
L, N, PE
Mains connection
LED 4 LED 3
ts
TD-0030167
Änd.Index
LED 4 LED 3
00
Änd.Index
Datum
Visum
Ersetzt durch:
PrimAX
Bedienfeld
für BA
Biral AG
CH-3110 Münsingen
Ersatz für:
Massstab gezeichnet
18.05.2015
ts
3:1
geprüft
Freigabe
PDM_Nr
TD-0030188
Zeichnungsnummer
Änd.Index
961935
00