Dibo JMB-M Mode D'emploi page 116

Masquer les pouces Voir aussi pour JMB-M:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

E N
O P E R AT I O N
1 high pressure function
2 low pressure function / High
temperature function
1
2
24 O P T I O N F I L L I N G P U M P
The filling pump is used for pumping the water from the external tank to the
JMB-M water tank. There is a float protection in the water tank thus to prevent
that the filling pump continues to pump water (overflow protection) from the
external tank to the JMB-M water tank. The filling pump can run dry without any
damage. It will, however, reduce unnecessary battery power. The filling pump
can be switched on/off through the display. See also added manual of the filling
pump. The filling pump can work approx. 15 minutes after the engine has been
stopped. Use the pump only with clear water! The overflow protection of the
water tank ensures that the pump will stop automatically when the tank is filled
with water.
25 O P T I O N H I G H P R E S S U R E VA LV E
The high pressure valve is located below the control panel at the left high
pressure hose reel and with it, you can close the water supply of the left
spray equipment or by using both reels. Pay attention: use the correct spray
equipment! Steam lance 400 mm for single reel use, steam lance 200 mm for
double reel use. Note: the high pressure valve is not mounted when you choose
a low pressure hose/reel & high pressure hose/reel.
26 S A F E T Y T H E R M O S TAT C H I M N E Y
If the temperature on the temperature probe exceeds the setpoint value.
The chimney thermostat will now arrange that the fuel valve and the burner
motor will be interrupted directly. The chimney thermostat can only be reset by
means of pushing the green reset button on the thermostat (first unscrew the
black protection) in the burner electric box.
27 T R AC K & T R AC E ( O P T I O N )
The trailer can be equipped with a tracker. The necessary information/data can
be achieved via a login on the tracker website. Also use/reed the delivered
manual of the tracker (1.780.510).
Pay attention: when you want to use the Track & Trace, first
reconnect the tracker to the battery of the trailer. This can happen
by inserting the delivered fuse of 1A in the fuse holder "F14" (in
the burner electric box) whereby the tracker will charge.
When the tracker has power supply, the tracker will attempt to connect to GPS
satellites, which will update the date and time and the device will receive the
correct settings again after which it will send all the logged data to the platform.
The SIM card must have a connection with a mobile phone network to send all
relevant data.
DiBO 20
2
2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

1.780.122

Table des Matières