Static Pressure; Check List; Test Run; Check Items - Fujitsu 9384203007-04 Manuel D'installation

Climatiseur unite interieure ( type a conduit)
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

■ Airflow adjustment at heater only operation
By selecting the heater output in the table below at heater only operation, this function
adjusts the airfl ow volume according to the heater output to prevent cold air feeling.
Setting
Function Number
Value
00
01
02
93
03
04
05
Airfl ow volume is for reference.
Since the airfl ow volume by motor has the upper limit and lower limit, the airfl ow volume
diff ers depending on the models or settings even if this setting is performed.
■ Setting record
• Record any changes to the settings in the following table.
Function setting
Filter sign

Static pressure

Room temperature control for indoor unit sensor
Room temperature control for wired remote controller
sensor
Auto restart
Room temperature sensor switching
Cold air prevention
External input control
Room temperature sensor switching (Aux.)
Indoor unit fan control for energy saving for cooling
Switching functions for external output terminal
Control switching of external heaters
Operating temperature switching of external heaters
Outdoor temperature zone boundary temperature A
Outdoor temperature zone boundary temperature B
Standby time for auxiliary equipment operation
Heat pump backup setting
Emergency heat
Fan delay time
External heater use in defrosting
Airfl ow adjustment for operation mode
Airfl ow adjustment at heater only operation
After completing the Function Setting, be sure to turn off the power and turn it on again.
7. 2. Static pressure
For details, see the Fan performance curve of the technical data.
Model
24/30/36/48

8. CHECK LIST

Pay special attention to the check items below when installing the indoor unit(s). After
installation is complete, be sure to check the following check items again.

Check items

Has the indoor unit been installed correctly?
Has there been a check for gas leaks (refrigerant pipes)?
Has heat insulation work been completed?
Does water drain easily from the indoor units?
Is the voltage of the power source the same as that indicated on the label
on the indoor unit?
Are the wires and pipes all connected completely?
Is the indoor unit grounded?
Is the connection cable the specifi ed thickness?
Are the inlets and outlets free of any obstacles?
After installation is completed, has the proper operation and handling
been explained to the user?
Operate the unit according to the operating manual provided, and check
that it is operating normally.
9384203007-04.indb 17
9384203007-04.indb 17
(♦... Factory setting)
Setting Description
Heater output range
No heater
0 - 3.4 kW (Min. CFM)
3.4 - 6.8 kW (350 CFM)
6.8 - 10.4 kW (710 CFM)
10.4 - 13.7 kW (1070 CFM)
13.7 - 17.1 kW (1410 CFM)
Setting Value
cooling
heating
cooling
heating
Range of static pressure
0.1 to 1.0 in. WG (20 to 250 Pa)
Check box

9. TEST RUN

9. 1. Check items
Is operation of each button on the remote control unit normal?
Does each lamp light normally?
Is the drain normal?
Do not have an abnormal noise and vibration during operation?
Do not operate the air conditioner in test run for a long time.

9. 2. Operation method

Depending on your installation, choose from the following:
■ By the wireless remote controller (with [TEST RUN] button)
• To start test run, press the [START/STOP] button and the [TEST RUN] button on the
remote controller.
• To end test run, press the remote controller [START/STOP] button.
■ By the IR receiver unit
• To start test run, press the [MANUAL AUTO] button of the IR receiver for more than 10
seconds (forced cooling).
• To end test run, press the [MANUAL AUTO] button for more than 3 seconds or press
the remote controller [START/STOP] button.
• The Operation indicator lamp and Timer indicator lamp will simultaneously fl ash during
the test run mode.
■ By the wired remote controller
• For the operation method, refer to the installation manual and the operating manual of
the wired remote controller.
Heating test run will begin in a few minutes when HEAT is selected by the remote controller
[reverse cycle model only].

10. FINISHING

Install the heat insulation material after performing a refrigerant leak check (see the
installation manual for the outdoor unit for details).
Coupler heat insulation
Coupler heat insulation
(Accessory)
No gaps
Be sure to overlap
the insulation.
Indoor unit side
Cable ties (large)
(Accessory)
CAUTION
There should be no gaps between the insulation and the product.
CAUTION
• After connecting the piping, check the all joints for gas leakage with gas leak detector.
• Once the pressure checking has been completed using nitrogen, please refer to the
outdoor unit installation manual to complete the evacuation process.
• Install heat insulation around both the large (gas) and small (liquid) pipes. Failure to
do so may cause water leaks.

11. CUSTOMER GUIDANCE

Explain the following to the customer in accordance with the operating manual:
(1) Starting and stopping method, operation switching, temperature adjustment, timer, and
other remote controller operations.
(2) Cleaning and maintenance of the product, and other items such as air fi lters and air
louvers if applicable.
(3) Give the operating and installation manuals to the customer.
(4) If the indoor unit custom code is changed, and the installation includes a wireless
remote controller, inform the customer the changed code. (On some wireless remote
controllers, the custom code may return to A when batteries are replaced.)
(Gas and liquid pipes)
Pipes
En-17
2020/12/04 12:44:49
2020/12/04 12:44:49

Publicité

Table des Matières
loading

Table des Matières