Tv 401/301 Nsf Controller Installation - Agilent Technologies TV 401/301 NSF Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 41
17
16BTechnical Information
153BTV 401/301 NSF Controller Installation

TV 401/301 NSF Controller Installation

The controller can be bottom mounted.
To install the controller execute the following procedure.
See the following figure.
3
4
5
6
7
8
9
Figure 33
278/290
Turn the pump upside-down;
Screw the 4 fixing studs (provided with the accessories bag) in
the holes on the bottom of pump;
Place the controller on the studs aligning the 4 rubber holes on
the top of the controller case;
Press the controller towards the pump;
Turn the pump again;
Plug the line cord and connect the pump cable to the pump;
Connect the mating connector with the jumper on the interlock
signal to start the pump.
TV 401/301 NSF User Manual / 87-900-963-01 (E)

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

969-8928

Table des Matières