Ductwork, Wiring Locations - Monogram ZV800 Instructions D'installation

Hotte de type cheminée de 30 po
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

WALL-MOUNTED INSTALLATION—VENTED TO THE OUTSIDE

DUCTWORK, WIRING LOCATIONS

Determine the exact location of the vent hood.
■ L ocate the template packed with the literature.
- M easure 36" from the floor to the top of the
cooking surface. Add hood installation height
determined on page 7. Mark that location.
- Use a level to draw a straight pencil line on the wall.
3-3/4" c enterline to wall
6-1/2" dia. hole
FOR WALL VENT DUCT
13-3/4"
12-3/4"
2-1/16"
49-80271
JR 07-04
- Tape the template in position along the penciled line.
CHECK TO BE SURE THE TEMPLATE IS LEVEL.
Ceiling ducting:
If ductwork will vent straight up to the ceiling:
■ U se a level to draw a line straight up, from the
centerline on the template to the ceiling.
■ M easure 3-3/4" from the back wall to the centerline
of a 6-1/2" hole on the ceiling.
NOTE: If drywall is not present, add drywall thickness
to the 3-3/4" dimension.
Wall Ducting:
If ductwork will vent to the rear:
■ U se a level to draw a line straight up from the
centerline on the template.
■ M easure at least 3-3/4" above the top mounting
bracket holes shown on the template to the
centerline of a 6-1/2" dia. duct hole. (Hole may be
elongated for duct elbow.)
HOUSE WIRING LOCATION:
■ T he junction box is located on the top left side of
the hood.
■ W iring should enter the back wall 20" to 26" above
the bottom of the hood, and within 4" of the right
side of the centerline. Wiring should enter at least 4"
above the bracket on the right side.
1" = 2.5 cm; 1' = 0.3 m
49-80267 Rev. 4
Installation Instructions
For ceiling vent ducting
Ceiling
Centerline
3-3/4" min.
above top
mounting
bracket holes
Drill 1/8"
Drill 1/8"
Pilot Holes
Pilot Holes
Drill 1/8"
Drill 1/8"
Pilot Holes
Pilot Holes
5-1/16"
9-5/8"
C L
REAR WALL TEMPLATE
Drill 1/8"
Drill 1/8"
Pilot Holes
Pilot Holes
ALIGN BOTTOM EDGE WITH
PENCIL LINE INDICATING
8-1/8"
BOTTOM OF THE HOOD.
1
INSTALL FRAMING FOR HOOD
SUPPORT
IMPORTANT: Framing must be capable of
supporting 100 lbs.
8" Min. Opening for Ductwork
6" min. opening for ductwork
Centerline of
Centerline of
installation
Installation
space
Space
If drywall is present, mark the screw hole locations for
the top mounting brackets. Remove the template.
■ C ut away enough drywall to expose 2 vertical studs
at the bracket location indicated on the template.
■ I nstall a horizontal support at least 1" x 6" between
two wall studs at the mounting screw location. The
horizontal support must be flush with the room
side of the studs. Use cleats behind both sides of
the support to secure to wall studs.
■ R einstall drywall.
View From Rear
View from rear
Cleats
cleats
1" x 6" min.
1" x 6" Min.
mounting
Mounting
support
Support
9

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Zv800sjss

Table des Matières