3M Speedglas G5-01 Directives D'utilisation page 40

Masquer les pouces Voir aussi pour Speedglas G5-01:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ii.
From inside the welding helmet, press the task light mounting piece into the newly drilled holes. The short cable (welding helmet to task
light) then follows around the left side of the welding helmet, snapping into place on the faceseal.
iii. Continue routing the cable between the welding helmet and the head suspension, snapping at the rear of the welding helmet and finally
hooking around the retention loop at the rear of the welding helmet (Fig. 31b).
Fig. 31a
5.
4.
3.
2.
Fig. 31b
38
6.
1.

Publicité

Table des Matières
loading

Table des Matières