Testing Procedures; Motor Rotation Check; Final Checks - John Bean QUADRIGA 1000 Manuel De L'opérateur

Masquer les pouces Voir aussi pour QUADRIGA 1000:
Table des Matières

Publicité

124
Installation Instructions
IV. Testing procedures

Motor rotation check

This type of check must be made on machines at the
end of installation only.
• Press the turntable rotation control pedal: the wheel
must start and turn clockwise.
Should it rotate anticlockwise the machine must be
stopped and must not be used until it has been repaired
by an authorized technician.
WARNING: ANY DAMAGE CAUSED BY NON
APPLICATION OF THE ABOVE INSTRUCTIONS SHALL
NOT BE DEBITED TO THE MANUFACTURER AND
SHALL VOID THE WARRANTY.

Final checks

When you start up the machine for the first time you
should:
• Check hoses and hose connections for air leaks.
• Check the oil level in the hydraulic control unit tank.
If necessary, top up the hydraulic circuits to the level
indicated with ESSO Niuto H46 or a similar type oil.
v Instructions for the operator.
The following
only applies if a unit is installed by a Service
Technician, who should do the following:
• Run the tests required at the end of machine
installation.
• Show the operator how to switch the unit on and off.
• Show all machine manoeuvres to the operator.
• Explain to the customer how to perform machine
maintenance.
• Deliver the Use and Maintenance instruction manual,
the Compliance Declaration and any other
documents, such as the Machine Spare Parts
Handbook.
Operator's Manual
QUADRIGA 1000/BB

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Quadriga 1000 bb

Table des Matières