!
1. The battery meter displays the charge level of the batteries;
when fully charged, all meter lights are illuminated.
1
3. When the battery meter turns RED the vacuum motor and the brush motor will stop. Once the motors have stopped, turn off the
vacuum motor and lift the brush deck. Turn the key off then back on. If required switch the vacuum motor on to pick up any remaining
liquid. Take machine to charging location and place on charge. Ensure the vacuum motor is switched off and the machine is turned off
by the key before charging.
Insert the charging lead required for your country into the charging point.
The machine charging point is located to the rear of the machine under the control panel.
Connect to a suitable power supply.
Once mains power is connected the red charging indicator will illuminate.
To ensure a full charge, the machine should be left for a period of 8 - 10 hrs.
Once fully charged, disconnect the charging lead from both the power supply and the machine.
Machine charging point, above footplate.
The large capacity gel batteries are sealed for life and are totally maintenance free.
The on-board charger automatically monitors the charging process and will switch off when the batteries are fully charged.
NOTE: The charging lead supplied with your machine may differ than the lead shown.
Once the charging lead has been connected the machine will be INHIBITED.
The battery charge indicator display lights will show the current charge state.
Charging indicator (see page 16).
To ensure a full charge, the machine should be left until the charging indicator shows green.
Once fully charged, disconnect the charging lead from both the power supply and the machine.
28
www.numatic.co.uk
Always ensure that the machine is switched off prior to charging.
3
Insert country specific charging lead.
2. As the machine is used and the batteries are discharged,
the meter lights will go out from right to left.
2
Red charging indicator illuminates when charging.
Machine Charging
!