Machine Operation; Important; Setting The Cleaning Controls; Waste Water Tank Full - Numatic CRG 8055/100T Notice Originale

Table des Matières

Publicité

Machine Operation

!
Do not operate machine unless the operator manual has been read and fully understood.
Drive the machine to the cleaning site (read set-up guide again if necessary).
Before cleaning operation, place out appropriate warning signs and sweep or dust-mop the floor.
When ready for cleaning lower the floor tool (page 10) and the brush deck (page 12).

Setting the Cleaning Controls

Switch machine on. Battery charge-level
indicator illuminates.

Waste Water Tank Full

The vac shut off system stops the airflow when the top waste water tank is full.
The vac motor will continue to run, there is an audible difference in the sound when the shut off system operates.
For more details on checking and cleaning the shut off system see page 24.
!
Always ensure that the floor is pre-swept and relevant safety signs are displayed.
16
www.numatic.co.uk

IMPORTANT

Low
Set the water flow rate as required.
Open
High
Switch the vacuum motor on.
!
Closed
!

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Crg 8055/120tCrg 8072/100tCrg 8072/120t

Table des Matières