Installing The Operator - Erreka TORO Manuel De L'installateur

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

INSTALLATION
3

INSTALLING THE OPERATOR

Assembly positions and levels (mm)
Secure the base plate to the floor
1 Position the ducts (1) for electrical installation.
62
Installation Guide
1
Gate
2
Rack
3
Base plate
4
Drive pinion
5
Operator
6
Magnet holder plates
7
Limit switch magnets
8
Magnet holder plate support
2 Secure the base plate (2) to the floor, taking into
account the assembly levels. To do this:
2.1 Fold the tabs (3) of the base plate.
2.2 Use pliers to fold the bottom (4) of the tab
and thus ensure attachment to the base
plate.
2.3 Introduce the plate tabs and the anchor
bolts (5) whilst the cement is still wet.
3 Level the base plate (2) .

Publicité

Table des Matières
loading

Table des Matières