POWR
TIMING BELT
EXPLODED DIAGRAM
265 Nm (27 m
kg, 192 ft
•
40 mm
40 Nm (4.0 m
13
14
15
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
TIMING BELT REMOVAL
Stator coil assy.
1
Bolt
2
Flywheel cover bracket
3
Bolt
4
Spring
5
Timing belt tensioner
6
Plastic band
7
Hose
TIMING BELT
2
7
6
Ib)
•
10 × 45 mm
kg, 29 ft
Ib)
•
•
5
6 × 30 mm
1
3
4
8
16
Q'ty
Follow the left "Step" for removal.
Refer to "STATOR COIL ASSY.".
2
1
1
1
1
2
1
5-11
9
10 × 35 mm
60 Nm (6.0 m
kg, 43 ft
•
10
12
Service points
E
Ib)
•
11