Installation Check-Up - Faema E71 Utilisation Et Installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 87

5. Installation Check-up

WARNING: AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY
(see the Installation Module C)
WATER CONNECTIONS
No leaks from the connections or tubes
FUNCTIONING
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-levelling device is working properly.
The expansion valves are working properly
WARNING: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE
ALLOWING THE WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS
ACCORDING TO THE INSTRUCTIONS BELOW:
GROUPS
Hook up the lter holders to the groups (without coffee).
Let each group dispense water for about a minute.
HOT WATER
Continuously dispense hot water (pressing the appropriate button) until at least 4 litres of water have been used.
See the "Hot water dispensing" chapter in the User's Manual.
STEAM (also with Autosteam)
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
02_E71_1USO_1646.indd 7
.
7 EN
17/11/2016 13:41:02

Publicité

Table des Matières
loading

Table des Matières