Use; Daily Operation - Faema E71 Utilisation Et Installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 87

USE

10. Daily operation

"Before setting the machine to work, make sure that:
• the main electric power switch is on;
• the mains water tap has been turned on".
1
ON
Press the backlit main switch to turn on the machine.
3
If one of the
coffee will be served at the temperature
reached at that moment.
All of the other keys are disabled
because the working pressure has not
been reached.
While waiting for the machine to be
ready for use, insert the lter holders
in the units.
02_E71_1USO_1646.indd 11
2
During this phase, the boilers are loaded and the heating
phase begins.
4
keys is pressed,
The preset working pressure must be reached before the
machine is ready for use.
11 EN
CHECK BOILER
17/11/2016 13:41:04

Publicité

Table des Matières
loading

Table des Matières