Installation Check-Up; Hot Water - Faema Enova S Utilisation Et Installation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 39

5. Installation Check-up

WARNING: AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY (see the
Installation Module C).
WATER CONNECTIONS
No leaks from the connections or tubes
FUNCTIONING
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-leveling device is working properly.
The expansion valves are working properly
WARNING: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING
THE WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING
TO THE INSTRUCTIONS BELOW:
GROUPS
Let each group dispense water for about a minute.

HOT WATER

Continuously dispense hot water (pressing the appropriate button) until at least 2,5 liters of water have been used for
a machine with 1 group, 6 liters for a machine with 2 groups and 9 liters for a machine with 3 groups (see the "Hot
water dispensing" chapter in the User's Manual).
STEAM
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
5 EN

Publicité

Table des Matières
loading

Table des Matières