Automatic Operation - Pentair Jung Pumpen COMPLI 108/2 ME Instructions De Service

Masquer les pouces Voir aussi pour COMPLI 108/2 ME:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 14
the plug in the case of compli 300). The potential-free contact
of the centralised alarm can be loaded with a maximum of 5 A /
250 VAC. The contact opens after the fault has been remedied.
Battery pack for alarm system (not compli
300)
The alarm device is mains-dependent in its standard version,
i.e. it is not possible to trigger a high-water alarm in the event
of a power failure. To enable the alarm device to work even if
there is a power failure, a rechargeable battery pack must be
used. Open the transparent cover. Connect the battery pack to
the connection clip, and use the existing cable ties to attach it
to the intended position (G1) on the PCB. The battery pack can
supply the alarm system with power for about 1 hour in case of
permanent alarm.
After return of the mains voltage, the battery pack is charged
again automatically. An empty battery is ready for operation
within approx. 24 hours. It is fully charged after about 100
hours.
Check the function of the battery pack at regular intervals! To
do so, disconnect the unit from the mains and trigger a high-
water alarm. The volume of the acoustic signal must not be-
come significantly quieter over a period of several minutes.
The service life is about 5 years. Note the insertion date on the
battery pack and after five years the battery pack should be re-
placed as a precautionary measure.
CAUTION!
Only use the 9V-NiMh battery supplied by the manufacturer! If
dry-cell batteries or Lithium batteries are used there is a dan-
ger of explosion!
Time meter
An optional time meter can be fitted in the control unit (not
compli 300). To do so, shorten the connections of the time me-
ter to approx. 8 mm and insert them into the four sockets at
location BSZ on the printed circuit board. If there is no time
meter indication after switching on the unit again, rotate the
time meter through 180°.
Shutting down the internal alarm buzzer
Not compli 300. Remove the sealed jumper (BRX/BRX1). To
prevent the jumper from getting lost, attach it to a pin of the
two-pole pin connector.
External alarm buzzer (accessory)
Open the transparent cover on the control unit.
An additional separate acoustic 12 VDC signal transmitter with
a current consumption of not more than 30 mA can be con-
nected to terminals "S+" and "S-". The internal alarm buzzer can
either be switched on or off.
In the case of compli 300, a mains-independent alarm device
can be fitted as an accessory. There is a mounting base on the
tank for this purpose.
In the case of duplex units: External 230V~
flashing light or warning light (accessory)
Connect a 230V~ lamp (1 A max.) to terminals N and 41.
Lay an insulated wire bridge from terminal U~ to terminal 40.
The electric circuit is protected by F1.
Set Jumper BRX2 as follows: Flashing light without BRX2
(Continuous ===) Warning light with BRX2 (Flashing (_Π_Π_ )
OPERATION
Test run and functional check
1. Open the maintenance cover of the tank.
2. Open the shut-off valves in the inlet and the pressure pipe.
3. Connect the unit to the power supply and observe the indi-
cation for the rotating field direction.
4. Fill the tank up to the switch-on level.
5. The pump will now switch on and empty the tank. Observe
the pumping process through the maintenance opening.
6. Lift the float of the level controller slowly by hand until it is
above the switch-on point and hold it there until the alarm
is triggered.
7. Then close the maintenance opening with the cover and
seal.
8. Check to ensure that the tank, fittings and pipes are water-
tight, by carrying out several switching runs.

Automatic operation

Automatic operation is the normal operating mode of the unit.
The rocker switch must be set to "Automatic". The integrated
level controller switches the pump on and off depending on the
water level in the tank. A green LED lights up when the pump is
operating (in the case of compli 300 when it is ready for opera-
tion).
NOTICE! If unusually large quantities of wastewater flow into
the unit (e.g. when a pool is drained), partially close the shut-
off valve at the inlet until the unit can operate normally again,
switching on and off, (not pumping continuously, since this
could overheat the pump motor).
Manual operation
Set the rocker switch to "Hand". The pump will now operate
permanently and independently of the wastewater level. The
pumping out operation should therefore be observed through
the maintenance opening.
Shutting down
Set the rocker switch to "0". This shuts down the pump. The
alarm system remains ready for operation.
DANGER!
Do not use the position "0" of the selector switch for repair and
maintenance work on the control and pump, but always unplug
the unit from the mains.
Inspection
To maintain operational reliability, carry out a visual inspection
of the unit, including the pipe connections, once a month.
MAINTENANCE
Maintenance and inspection of this product must be carried
out in accordance with EN 12056-4. To ensure continued reli-
ability of service, we recommend that you take out a service
contract.
NOTICE! The maintenance of the sewage lifting station and
maintenance measures are carried out by specialists at inter-
vals of 3 months in commercial premises, multi-family homes
in 6 months or 12 months in family homes.
ENGLISH
11

Publicité

Table des Matières
loading

Table des Matières