GB
PLACING OUT OF OPERATION AND CLEANING
1
Using coating materials in sacks
• Pull sliding cover back about 15 cm.
• Place sack on the sliding cover in such a way that the top
faces the front end of the sliding cover.
• Cut sack open.
• Allow the coating material to flow into the receptacle.
• Move sack mangle forwards over the sack by turning the
crank handle until the guide rollers reach the stop pins.
• To ease pressing – move sack mangle to frame of sack mang-
le with your left hand.
• Strip remaining coating material from sack opening with a
spatula..
9.3
CONTAINER SUCTION SYSTEM
• Turn off device at master switch.
• Pull out mains plug from the socket and ensure that it can-
not be plugged back in unintentionally.
• Unscrew the hexagon nuts (2) on the receptacle (1, Fig. 21),
remove washers.
• Remove receptacle.
• Attach container connection (3) to the base of the receptac-
le. Mount disks and secure with hexagon nuts (4).
• Connect suction hose (5) to container connection (3). Al-
ternatively, connect connecting bridge (6) to the container
connection (3) and connect suction hose to connecting
bridge.
• Fill suction hose with water and connect to the container.
• Turn on mortar spraying machine.
48
2
20
3
5
4
Note:
All connections must be sealed air tight so that a vacuum can
be produced.
Place a small amount of machine lubricant onto the rubber
seals of the connections in order to allow for the easy opening
and closing of the connectors.
21
2
6
4
10
PLACING OUT OF OPERATION AND
CLEANING
Do not spray the motor or control unit of
the mortar spraying machine with water
jet, highpressure or steam cleaning equip-
ment. Water could penetrate the machine
and cause a short-circuit.
Plast Coat 15
1
5
3