Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION

Building-in

• Check that the cabinet and the cut-out meet the dimension and
ventilation requirements.
• Treat the sawn ends of wooden or synthetic worktops with sealing
varnish if necessary, to prevent moisture causing the worktop to
swell.
• Lay the hob upside down on the worktop.
• Remove the protective layer from the sealing tape and apply the
tape in the groove of the aluminium profile or on the edge of the
glass plate. Do not stick the tape around the corners, but cut 4
separate pieces to seal the corners well.
• Turn the hob over and lay it in the recess.
• Connect the appliance to the mains. The appliance is ready for use.
• Check that it works properly. If the appliance has been wrongly
connected either a bleep will sound or nothing will appear in the
displays, depending on the error.
EN 29

Publicité

Table des Matières
loading

Table des Matières