Building-In; Technical Specifications - ETNA A812 Notice D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Building-in

1. Make the cut-out in the work surface. Ensure
that there is sufficient space allowed at the
sides and at the back.
.
580
510
45/70
560
490
10
10 mm
Please note:
The area to be cut away at the front is
measured from 10 mm from the body of the
cupboard (cupboard front without door).
2. Make a hole in the side of the kitchen cabinet
to enable the gas pipe to be passed through.
3. Place the appliance in the cut-out.
4. Secure the appliance in position.
5. Make the gas connection. Check the gas
connections with a soap/water mixture
(see "Gas Connection").
6. Put the plug in the socket
(see "Electrical Connection").
7. Test to check the appliance is operational.
The building in of the hob in combination with a
built-in oven is described in the installation guide
fig. 4
for the oven.
Attention!
The underside of this built-in hob becomes
hot. Take care that you do not place any
flammable or plastic objects in any drawer
under the appliance.

Technical specifications

Type of hob
Elektric:
3-core connection lead to oven
Connection 230 V - 50Hz 0,8 VA
Spark ignition
Gas:
Connection G3/8"
fig. 5
(also see table on cover)
A812H
A812V
A865V

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

A865

Table des Matières