Turn the partly completed machinery to the right.
Tighten the three screws with wrench sw13.
2.3 c
Onnecting the pArtly cOmpleted mAchi
nery
Connect the power supply cable to X1. (1)
Connect the network cable to X2. (2)
Tighten the screws at the cables by hand.
Avoid pulling forces on the cables.
For voltage supply to the EFC02 on the customer side, a
SUHNER Power-Hub can be used.
2.3.1 p
(X1)
Ower supply
Connect the power supply cable 101002092 to the EFC-
02 with the M12-A coded plug and wire the free ends of
26
the cable on the customer side:
Brown
White
Black
Blue
Use a 2.5AT back-up fuse
2.3.2 c
(X2)
OmmunicAtiOn
Connect the network cable 101002093 to the EFC-02 with
the M12-D coded plug and connect to the RJ45 plug on
the customer side.
2.4 r
Ating dAtA
Input voltage
Input current
Protection class
-
Total stroke
Axial target force
Payload
Weight
Mx
My
Mz
Communication interface
Web interface / modbus TCP All additional buses are
supported through a bus coupler. See "Operating instruc-
tions Power-Hub".
2.5 O
c
perAting
OnditiOns
Temperature range for operation: +5 to +50°C
Relative humidity in air: 90% at +30°C, 65% at +50°C
The partly completed machinery is water-repellent, not
waterproof.
This must be taken into consideration when operating in
damp environments.
48V DC
GND
Do not connect
Do not connect
48V DC
max. 1.0A
IP54
20mm
max. 200N
max. 15kg
3.9kg
max. 150Nm
max. 150Nm
max. 150Nm