Télécharger Imprimer la page

Kohler Premise K-702479-8L-SHP Instructions D'installation page 14

Publicité

Les langues disponibles

Les langues disponibles

6. Mark the Wall for Cleat Alignment
Align the alignment tool with the top of the fixed panel wall jamb.
Using a pencil, mark the wall at the alignment tool's second ridge.
Using a level and a pencil, mark a plumb line on the wall approximately 1-1/4" (32 mm) along the length of the level.
1579984-2-A
Top of Wall Jamb
14
1-1/4"
(32 mm)
Inside of Shower
Kohler Co.

Publicité

loading

Ce manuel est également adapté pour:

Premise k-702477-8g81-shp