Télécharger Imprimer la page

SMA SUNNY BOY STORAGE 3.8-US Instructions D'installation page 29

Masquer les pouces Voir aussi pour SUNNY BOY STORAGE 3.8-US:

Publicité

Les langues disponibles

Les langues disponibles

SMA Solar Technology AG
Procedure:
1. Opening the Connection Unit Unscrew all 6 screws (TX25) and carefully remove the enclosure
lid toward the front.
2. Unscrew the 2 screws on the right and left side of
the Power Unit (TX25). As a result, the Power Unit
and the Connection Unit are not connected to one
another.
3. Disconnect the Connection Unit from the Power Unit.
4. Align the connection unit horizontally and vertically.
Mark the position of the drill holes using the
brackets.
5. Drill the holes in the marked positions.
6. Insert screw anchors into the drill holes if the support surface requires them.
7. Secure the Conection Unit horizontally using screws
and washers.
8. Check whether the Connection Unit is firmly positioned.
Installation Manual
5 Mounting
SBSxx-US-10-IA-xx-14
29

Publicité

loading

Ce manuel est également adapté pour:

Sunny boy storage 5.0-usSunny boy storage 6.0-us