Positioning The Elements And Starting The Cycle - Ugin e.ON SINTER Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Instructions for use (rev 05/18)

6.7. Positioning the elements and starting the cycle

1) Positioning of support
- For use the furnace, always place the support on the platform. Use only the original support
e.ON SINTER – UGIN DENTAIRE.
- Before use, check if it is in perfect condition: presence of dirt or damage. Clean with brush if
necessary (see chapter 8 - Maintenance). If the support is damaged or cracked, do not use
and replace it.
- It is composed of a base and a floor. According to the number of tray for sinterizing to
position, it is necessary to place or remove the floor:
Number of tray to place
1
2
3
IMPORTANT: observe these indications
so as not to exceed the maximum height
(risk of damage)
2) Positioning of elements and tray for sinterizing
- Empty a zirconia pearls into a tray (a layer at the bottom is sufficient to prevent the
elements from rubbing on the bottom and sides).
- Place the elements in a tray (avoid touch amongst themselves), then place the cover.
- The three trays can be stacked. According to yours needs, you can stack 2 or 3 trays. Always
place the cover on the last tray.
- Place the tray(s) at the centre of support.
Note: for 60 elements.
Beads for sintering must be changed in any tray if a
discoloration in yellow color appears
UGIN DENTAIRE
Support to place
base + floor
base + floor
base
e.ON SINTER
Tray for sinterizing with cover
39

Publicité

Table des Matières
loading

Table des Matières