Example: Cycle For Zirconia Block Ireland - Ugin e.ON SINTER Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Instructions for use (rev 05/18)
3) Closing the platform and start cycle
When the cycle has been selected and setting (see previous chapters):
- close the platform: press "arrow key upward" on touch screen
- start the cycle: press "run" key on touch screen
Or start the cycle directly with the "run" key.

6.8. Example: cycle for Zirconia block Ireland

Sequence of cycle
1. 10°C/min, time required: 30 minutes
2. 17,5°C/min, time required: 40 minutes
3. 4,83°C/min, time required: 100 minutes
4. Remains: time required 120 minutes
5. Cooling 13°C/min, time required: 52 minutes
6. Natural cooling
 Total programmed time: 342 minutes (5 hours 42 minutes)
 Natural cooling time: 268 minutes (4 hours 28 minutes)
 Total cycle time : 610 minutes (10 hours 10 minutes)
UGIN DENTAIRE
Example: cycle for Zirconia block Ireland
, and
Sintering curve
Temperature
Stage
(°C)
1
C1: 0
2
C2: 300
3
C3: 1000
4
C4: 1480
5
C5: 1480
6
C6: 800
e.ON SINTER
Time
(minutes)
T1: 30
T2: 40
T3: 100
T4: 120
T5: 52
T6: -121
40

Publicité

Table des Matières
loading

Table des Matières