Télécharger Imprimer la page

Zehnder ComfoVar Aero Manuel D'installation Et D'entretien page 35

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Index
Foreword
Table of terms and abbreviations
1.
Unpacking and preparing the installation
1.1
Package contents
1.2
Checking the delivery
1.3
Required tools and mounting material
2.
Description and recognition
2.1
Operation of the air volume controller
2.2
Parts required for installing the air volume controller
3.
Safety
3.1
Safety with regard to installation
3.2
Assembly instructions
3.3
Installation instructions
3.4
Warranty
4.
Specifications
4.1
Technical specifications
4.2
Dimensions of the VM and CM
5.
Installation
5.1
General
5.2
Installation of the optional adapters on the VMs
5.3
Removing/placing VM interior from/in VM
5.4
Installation of the VM's
5.4.1 Changing the air flow direction of the VM
5.5
Fitting the silencer
5.6
Installing the CM
5.7
Connecting cabling and power supply
5.7.1 Connecting mains power to the CM
5.7.2 Connecting cables between CM and VMs
5.7.3 Connecting optional control components to the CM
5.7.4 C onnecting cables CM-connect in the AHU
5.7.5 Connecting cabling CM-connect per house
6.
Installation
6.1
General
6.2
Connect to CM Embedded Webserver (CM-EW)
6.3
Configuring the web server
6.4
Setup of a connected system
7.
Commissioning
7.1
General
7.2
Completing the commissioning procedure
8.
Malfunctions
9.
Maintenance
10. Dismantling and disposal
10001124369-0123-zw-zw-A4 ComfoVar Aero Installer_Service Zehnder-General_BOOK_2.indb 35
10001124369-0123-zw-zw-A4 ComfoVar Aero Installer_Service Zehnder-General_BOOK_2.indb 35
34
36
37
37
37
37
38
38
39
41
41
42
42
43
44
44
45
46
46
46
47
48
50
50
51
52
53
53
53
54
54
55
55
55
56
58
59
59
59
60
62
62
EN - 35
24-01-2023 11:10
24-01-2023 11:10

Publicité

loading