Télécharger Imprimer la page

SRAM 0808 Instructions D'installation page 9

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 53
C a B l e g u I d e M o u n t I n s t a l l a t I o n
The Cable Guide Mount should only be used when the cable guide is fastened with a screw. If the cable
guide is fastened with a rivet, use the Bottom Bracket Cup Mount or Adhesive Putty instead.
Installation Notes: Do not allow the magnet to contact the power meter. When properly installed, the
magnet should be in line with the cadence sensors and within 2-8 mm (1/16"-3/8") of the sensors.
1. Remove the existing cranks.
2. Loosen the cable guide screw. It may be helpful to shift the front derailleur to the small chainring
position, and the rear derailleur to the smallest cog. This will reduce the cable tension, and make it
easier to slide the cable guide mount under the cable guide.
3. Slide the mount under the cable guide. The guide can be installed with the magnet pointed down (as
illustrated) or up.
4. Reinstall the cranks.
5. Tighten the cable guide screw.
6. Confirm the magnet is within 2-8 mm (1/16"-3/8") of the sensor.
2-8 mm
(1/16"-3/8")
Cable Guide Mount installation
9

Publicité

loading