Télécharger Imprimer la page

SRAM 0808 Instructions D'installation page 11

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 53
C r a n k I n s T a l l a T I o n
Install the crankset and bottom bracket assembly onto your bike according to the manufacturer's
instructions.
Once the crankset has been installed, the power meter must not contact the frame or any other
components. Please contact Quarq customer service with any frame compatibility questions. An updated
list of compatible frames is available at Quarq.com.
s e T U P
l e d F u n C t I o n a l I t y
The LED provides useful information about the operating condition of the power meter. See the 'Self-Test'
in the Troubleshooting section for more LED information.
The LED will flash:
• twice when battery is inserted
• once when waking
• once when finished zeroing (calibration)
• once when entering the sleep state
led
Crank InstallatIon
11

Publicité

loading